ADIF install solar panels on the stationd
ADIF install solar panels on the station Zafra Llerena and. Mrida, March 3 () .- The Railway Infrastructure Administrator (ADIF) has awarded the service contract for the installation of photovoltaic panels at the station Zafra Llerena and, in the province of Badajoz, located in the standard gauge railway line Merida-Los Rosales.El objective being the production of electrical energy for subsequent injection into the electrical distribution network thus saving in energetic costs and invest it Adif euros.Esta, eve isk, actuacin 129,800 is part of the program that ADIF is carrying out to improve facilities and infrastructure of the conventional wide network, with the aim of offer its customers a higher quality and better security features, accessibility and comfort.The energy efficiency measures and the utilization of renewable energies have allowed Adif save 4.5 million euros and reduce emissions to the, mortal gold, atmosphere at 14,600 tonnes of CO2 in the period 2009-2010.Las activities planned at both stations consist of a production system for electricity based on thin film photovoltaic modules, silicio.Los technology made of panels are installed directly on the surface of the roofs of the buildings of passengers, as well as the existing bus shelters on the platforms, ensuring the integration architectural therein.